Error message

Notice: Undefined variable: rendered_rows in include() (line 15 of /home/content/92/6526592/html/sites/all/modules/views_slideshow/contrib/views_slideshow_cycle/theme/views-slideshow-cycle-main-frame.tpl.php).

South Entry Vestibule 9-15-13

The south entry vestibule was framed in and the first layer of roofing was completed on the south side of the building.

Taxonomy upgrade extras: 
Image: